Small Font Size Medium Font Size Large Font Size Home Contact Us Site Map Careers
  An ISO 9001:2000 Certified Company
 

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

  Integration  
Home Services Execution Integration
Individual equipments both indoor and outdoor need to be integrated to work the installation at a station as a system. For this, all outdoor functions need to be connected to indoor equipments through cables and functioning of the system as a whole is tested from control centre in close co-ordination with outdoor staff employed for outdoor functions.
At large busy stations outdoor functions are connected one by one and tested during the margin available between trains and revert back to the existing working. Thus the entire functions are tested from control room and kept ready for commissioning during the non-interlocked working period. This minimizes the period of Non-Interlocked working and traffic.
 
Services