Indoor Design |
|
 |
Based on Engineering plans and after survey of yard following documents are prepared: |
|
 |
Signal Interlocking Plan |
 |
Route Section plan based on approved Signaling Interlocking Plan from customer railway |
 |
Selection Table / Control Chart |
 |
Detail circuit diagram, based on approved selection table / control chart. |
|
|
|
 |
Power Designs |
|
 |
Assessment and arriving at power requirement. |
 |
Required Equipment Layout. |
 |
Detail assessment of type, coreage and conductor for power cables. |
 |
Power wiring diagrams. |
|
|
|
|
 |
Outdoor Designs |
|
 |
Based on approved Signaling plan and survey of yard following documents are prepared: |
|
 |
Cable Route Plan illustrating complete detail of cable route and required necessary protection such as GI pipes / RCC pipes at bridges, culverts, road, track crossing, platform crossing, etc. |
 |
Devising cable coreage plan based on functions. |
 |
Track Insulation plan: |
|
 |
For Track vacancy detection as AFTC ??? Frequency allocation plan |
 |
For track vacancy detection using Axel counters ??? counting head distribution plan |
|
|
|
 |
Location Placement Diagram |
 |
Detail location wiring diagram |
 |
Earthing detail diagram |
 |
Track device history cards. |
 |
Measuring Report Charts |
|
|
|
|
|
|
|